Rockfall Milepoint 49 Monitoring Plan for Check Dams on Mt. Hood Highway (US 26) (M.P. 49.10 to M.P. 49.23)
-
2003-07-31
-
By GeoSyntec Consultants ...
Details:
-
Alternative Title:Response to Task 4 : Stormwater Monitoring Plans
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This Stormwater BMP Monitoring Plan details the approach to be used for monitoring
roadside ditch sediment traps located on Highway 26 in the Mt. Hood National Forest.
These sediment traps were designed and installed by ODOT for the capture of sediment
and adsorbed pollutants associated with winter sand applications conducted by the
highway maintenance division.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: