Scully, T. C., Graves, C., & Allen, D. L. (2001). Construction Monitoring and Procedures for I-275 "Warranty Project" Kenton/Boone Counties (Report No. KTC-01-29/FR107-01-1I). University of Kentucky Transportation Center. https://rosap.ntl.bts.gov/view/dot/21542
Scully, Tim C., Clark Graves, and David L. Allen. Construction Monitoring and Procedures for I-275 "Warranty Project" Kenton/Boone Counties. Report no. KTC-01-29/FR107-01-1I. University of Kentucky Transportation Center, 2001. https://rosap.ntl.bts.gov/view/dot/21542.
Scully, Tim C., et al. Construction Monitoring and Procedures for I-275 "Warranty Project" Kenton/Boone Counties. University of Kentucky Transportation Center, 2001, Report no. KTC-01-29/FR107-01-1I, ROSA P. https://rosap.ntl.bts.gov/view/dot/21542.
In the summer of 2000, it was decided by the Kentucky Transportation Cabinet that a portion of eastbound and westbound I-275 needed repair due to fatigue. The design was 10 inches PCC or 13 inches of asphaltic concrete for Section B, and 9 inches PCC or 12 inches of asphaltic concrete for Section A. Alternate bids were accepted from asphalt and concrete contractors with a required warranty of 10 years or 10,000,000 ESAL’s, which ever came first. The Kentucky Transportation Center will be monitoring the performance of the pavement for the duration of the warranty and will be submitting an annual report showing any distress. This report details the construction process and shows just a few of the minor problems that were encountered after the completion of construction.
Scully, T. C., Graves, C., & Allen, D. L. (2001). Construction Monitoring and Procedures for I-275 "Warranty Project" Kenton/Boone Counties (Report No. KTC-01-29/FR107-01-1I). University of Kentucky Transportation Center. https://rosap.ntl.bts.gov/view/dot/21542
Scully, Tim C., Clark Graves, and David L. Allen. Construction Monitoring and Procedures for I-275 "Warranty Project" Kenton/Boone Counties. Report no. KTC-01-29/FR107-01-1I. University of Kentucky Transportation Center, 2001. https://rosap.ntl.bts.gov/view/dot/21542.
Scully, Tim C., et al. Construction Monitoring and Procedures for I-275 "Warranty Project" Kenton/Boone Counties. University of Kentucky Transportation Center, 2001, Report no. KTC-01-29/FR107-01-1I, ROSA P. https://rosap.ntl.bts.gov/view/dot/21542.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.