Welcome to ROSA P |
Stacks Logo
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.
 
 
Help
Clear All Simple Search
Advanced Search
State-of-the-art report on rapid repair techniques for bridge decks.
  • Published Date:
    1990
  • Language:
    English
Filetype[PDF-3.65 MB]


Details:
  • Alternative Title:
    State of the art report on rapid repair techniques for bridge decks ; Rapid repair techniques for bridge decks ; SHRP C103 task 4 state-of-the-art report on rapid repair techniques for bridge decks ; Concrete bridge protection and rehabilitation :chemical and physical techniques ;
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • OCLC Number:
    269374558
  • Abstract:
    Bridges that are candidates for rapid repair techniques have peak-hour traffic volumes that are so high that it is not practical to close a lane to repair the deck or to install a deck protection system except during off-peak traffic periods. This report summarizes the results of the first 25 months of a 55-month project (Task 4 of SHRP Project CI03) to investigate rapid techniques for the protection, rehabilitation, and replacement of bridge decks. The report is based on a review of the literature and the responses to questionnaires sent to state DOTs, Canadian provinces, selected turnpike and thruway authorities, technology transfer centers, and material suppliers. The report identifies the techniques being used by the DOTs and compares the techniques from the standpoint of frequency of use, performance characteristics, time demands, service life, maintenance, initial cost, and life cycle cost.

  • Format:
  • Main Document Checksum:
  • Supporting Files:
    No Additional Files
No Related Documents.
You May Also Like: