First annual report SHRP C103 task 4 : rapid repair techniques.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.
i

First annual report SHRP C103 task 4 : rapid repair techniques.

Filetype[PDF-3.03 MB]


English

Details:

  • Alternative Title:
    Rapid repair techniques :first annual report SHRP C103 task 4;SHRP C-103 task 4 first year annual report;Concrete bridge protection and rehabilitation :chemical and physical techniques;
  • Creators:
  • Corporate Creators:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    The objective of task four is to develop technically and economically feasible methods of concrete bridge deck protection, rehabilitation, and replacement. The objective of the task will be accomplished through a progression of six subtasks. The subtasks include: State-of-the-Art Review; Data reduction, analysis and comparison of alternatives; Refinement of details for selected installations; Selection of sites and development of special provisions; Evaluation of installations, Preparation of field guide manual. The first year work plan included the initiation of the State-of-the-Art Review. Approximately 68% of the first year work plan was completed during the first year. Thus, the 54 month task is about 32% behind schedule which is a result of problems which occurred in the signing of the first year subcontract with VDOT. However, the proposed second year contract was revised and the project will be back on schedule at the end of the second contract year. It needs to be pointed out that Task 4 being behind schedule will not affect the progress of the other project tasks. The results of the first year research work is primarily based on the response to questionnaires sent to state DOT's, Canadian Provinces, Thruway Authorities, T2 Centers, material suppliers (See Appendix A). The results of the study are based on the outline on rapid repair techniques presented in Appendix B.
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov