An examination of the Virginia Department of Transportation's 404 general permit program.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

An examination of the Virginia Department of Transportation's 404 general permit program.

Filetype[PDF-3.20 MB]


  • English

  • Details:

    • Creators:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      Several state and federal statutes require that the Virginia Department of Transportation (VDOT) obtain permits for any road construction activity that impacts wetlands and other bodies of water. These "[section] 404 permits" are issued by the u.s. Army Corps of Engineers and the Virginia Marine Resources Commission after several state and federal agencies have had an opportunity to review the permit application. Prior to 1982, the VDOT had to wait two to nine months for approval of a [section] 404 permit application. In an effort to streamline the permit application process, the VDOT established a General Permit Program in 1982 to cover the relatively small, uncontroversial projects that comprise the bulk of VDOT construction activity. The goal of the Program was to expedite the permit application process through the use of monthly interagency coordination group meetings at which reviewing agency comments were transmitted directly to the VDOT. The scope of this preliminary study was threefold: (1) a survey of the state and federal laws and regulations that require the VDOT to obtain permits for activity affecting wetlands and water bodies; (2) an explanation of the process by which the VDOT obtains these permits; and (3) pinpointing potential and existing problem areas in the VDOT's General Permit Program. The results of this study show that the General Permit Program has theoretically met its goal of expediting the [section] 404 permit application process by removing several obstacles formerly encountered by the VDOT. The Program is free of several factors including public notice requirements and the public comment period that cause delays for other state transportation agencies. Additionally, those factors that do sometimes cause delay in the General Permit Program also cause problems in most other east coast States as well. Finally, representatives of the agencies that review [section] 404 permit applications generally feel that this Program has successfully streamlined the permit application process while still ensuring adequate environmental protection.