Identification and evaluation of pavement-bridge interface ride quality improvement and corrective strategies.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Identification and evaluation of pavement-bridge interface ride quality improvement and corrective strategies.

Filetype[PDF-29.22 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Corporate Creators:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Edition:
      Final report.
    • Abstract:
      Bridge owners have long recognized that the approach pavement at bridges is prone to exhibiting both settlement and

      cracking, which manifest as the “bump at the end of the bridge.” This deterioration requires considerable on-going

      maintenance expenditures, added risk to maintenance workers, increased distraction to drivers, reduced steering control,

      increased damage to vehicles, a negative public perception of the highway system, and a shortened useful bridge life. This

      problem has recently begun to receive significant national attention, as bridge owners have increased the priority of

      dealing with this recurring problem.

      No single factor, in and of itself (individually), leads to significant problems. Rather, it is an interaction between multiple

      factors that typically leads to problematic conditions. As such, solutions to the problem require interdisciplinary thinking

      and implementation. The bridge-abutment interface is a highly-complex region and an effective “bump at the end of the

      bridge” solution must address the structural, geotechnical, hydraulic, and construction engineering disciplines. Various

      design alternatives, construction practices, and maintenance methods exist to minimize bridge approach settlement, but

      each has its own drawbacks, such as cost, limited effectiveness, or inconvenience to the public.

      The objective of this work is to assist the Ohio Department of Transportation in the development of pre-construction,

      construction, and post-construction strategies that will help eliminate or minimize the “bump at the end of the bridge.”

      Implementation of the details and procedures described herein will provide a tangible benefit to both the Ohio Department

      of Transportation and the traveling public, in the form of smoother bridge transitions, reduced maintenance costs, and a

      safer driving environment.

      As a result of this work, several conclusions and recommendations were made. Generally, these could be grouped into

      three categories: general, structural, and geotechnical. In some cases, the recommendations may require notable changes to

      the Ohio Department of Transportation bridge design policy. Suggestions for such changes have been made.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26