Test area investigation report mine research project GUE-70-14.10, BBC&M Engineering, pahse II, executive summary.
-
2003-06-01
Details
-
Alternative Title:Test area investigation report mine research project GUE-70-14.10, BBC&M Engineering, phase II : executive summary ; Mine research project-GUE 70-14.10, PID no. 18459 : executive summary
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
- Mines
- Coal mines
- Roads
- Subgrade (Pavements)
- Geological surveying
- Geophysical prospecting
- Risk assessment
- Forecasting
- Inspection
- Abandoned mines--Risk assessment--Ohio
- Abandoned coal mines--Ohio
- Mine subsidences--Ohio--Forecasting
- Roads--Subgrades--Inspection--Ohio
- Soil surveys--Ohio--Geophysical methods
- Geological surveys--Ohio
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Executive summary.
-
Corporate Publisher:
-
Abstract:The GUE-70-14.10 Mine Research Project is the investigation of a 2,100-foot-long section ; of Interstate 70 in Guernsey County, Ohio. Portions of the Project Area pavement were ; damaged as a result of mine subsidence. The damaged areas and other mined areas were ; remediated in 1995 by placement of grout in the abandoned mine workings beneath the ; roadway. Concerns are present regarding the post remediation condition of the soils and ; bedrock beneath the project. The objectives of the investigation were two fold: ; 1) detect the presence and ongoing formation of voids or anomalies beneath the pavement ; using various geophysical, geotechnical, and groundwater investigative methods. ; 2) field test and evaluate investigative methods to determine their suitability for use on ; other similar projects. ; The project work was completed in two phases. Phase I evaluated the effectiveness of ; various investigative methods on a 200- foot-long segment of the eastbound lanes. A ; report detailing the findings of the test method evaluation (Phase I) was submitted on ; January 12,200 1. Phase II of the project applied the most effective methods (as ; determined by Phase I of the work) to the evaluation of the entire Project Area. This report ; contains the findings of both the methods evaluation (project research) and evaluates the ; site specific conditions.
-