Short-term crack sealant performance and reducing bumps and transverse cracking in new hot mix asphalt overlays over crack sealants.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Short-term crack sealant performance and reducing bumps and transverse cracking in new hot mix asphalt overlays over crack sealants.

Filetype[PDF-1.00 MB]


  • English

  • Details:

    • Creators:
    • Corporate Creators:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Edition:
      Interim Report; Sept. 2007-Sept. 2009.
    • Abstract:
      This interim report is intended to provide preliminary information regarding the performance of crack sealants produced by three

      manufacturers during a two-year period in service in three pavements in Colorado. In addition, preliminary conclusions have been

      developed regarding the propensity of three of these sealants to contribute to bumps in new overlay hot mix asphalt. Results of

      performance evaluations made, to date, indicate that the crack sealants failed at a surprising rate after only one winter. However,

      subsequent performance surveys after twelve months and twenty-one months indicate a tendency for the sealants to heal. Routing the

      cracks prior to filling appears to provide the best performance when the filler is overbanded, and filling the cracks to within ΒΌ inch of

      the surface instead of flush with the surface or overbanding produced the poorest performance.

      Bumps accompanied by transverse cracking occurred over the crack sealants when a new hot mix overlay was placed after the crack

      sealants had been in service two years. The bumps and transverse cracks were exacerbated by utilizing steel rollers with vibration on

      breakdown of the hot mix asphalt overlay. The number of passes of the vibrating steel rollers further exacerbated the presence of the

      bumps and cracks. The same rollers used in static mode reduced the effect, and pneumatic rollers used for breakdown eliminated it.

      The ambient temperature and temperature of the substrate pavement during construction appears to have had little effect, as the same

      bumps and cracking occurred during vibratory breakdown after a small rain shower moistened the substrate pavement surface prior to

      the overlay hot mix asphalt placement.

    • Format:
    • Funding:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26