Balke, K., Chaudhary, N., Songchitruksa, P., & Pesti, G. (2009). Development of criteria and guidelines for installing, operating, and removing TxDOT ramp control signals (Report No. FHWA/TX-09/0-5294-1). Texas Transportation Institute. https://rosap.ntl.bts.gov/view/dot/16760
Balke, Kevin, Nadeem Chaudhary, Praprut Songchitruksa, and Geza Pesti. Development of criteria and guidelines for installing, operating, and removing TxDOT ramp control signals. Report no. FHWA/TX-09/0-5294-1. Texas Transportation Institute, 2009. https://rosap.ntl.bts.gov/view/dot/16760.
Balke, Kevin, et al. Development of criteria and guidelines for installing, operating, and removing TxDOT ramp control signals. Texas Transportation Institute, 2009, Report no. FHWA/TX-09/0-5294-1, ROSA P. https://rosap.ntl.bts.gov/view/dot/16760.
The Texas Department of Transportation (TxDOT) uses ramp control signals (also called ramp meters or
;
flow signals) to control the rate at which vehicles enter the freeway. This helps TxDOT (1) promote a more
;
consistent and uniform flow of traffic entering the freeway, and (2) promote a more efficient use of the
;
existing freeway capacity.
;
The purpose of this project was to develop guidelines and criteria to assist TxDOT decision makers in
;
determining when and where to install new ramp control signals and remove existing ramp control signals
;
when they no longer provide a benefit to freeway traffic. This report documents the process, procedures, and
;
research used to develop those guidelines and criteria. The actual guidelines, criteria, and forms are in
;
Product 0-5294-P1, “Operating Guidelines for TxDOT Ramp Control Signals.”
Balke, K., Chaudhary, N., Songchitruksa, P., & Pesti, G. (2009). Development of criteria and guidelines for installing, operating, and removing TxDOT ramp control signals (Report No. FHWA/TX-09/0-5294-1). Texas Transportation Institute. https://rosap.ntl.bts.gov/view/dot/16760
Balke, Kevin, Nadeem Chaudhary, Praprut Songchitruksa, and Geza Pesti. Development of criteria and guidelines for installing, operating, and removing TxDOT ramp control signals. Report no. FHWA/TX-09/0-5294-1. Texas Transportation Institute, 2009. https://rosap.ntl.bts.gov/view/dot/16760.
Balke, Kevin, et al. Development of criteria and guidelines for installing, operating, and removing TxDOT ramp control signals. Texas Transportation Institute, 2009, Report no. FHWA/TX-09/0-5294-1, ROSA P. https://rosap.ntl.bts.gov/view/dot/16760.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.