U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Evaluating the Effects of Heavy Sugarcane Truck Operations on Repair Cost of Low Volume Highways.

File Language:
English


Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    This study assesses the economic impact of overweight permitted vehicles hauling sugarcane on Louisiana highways. ; The highway routes being used to haul these commodities were identified, and statistically selected samples were used in ; the analysis. Approximately 270 control sections on Louisiana highways carry sugarcane are involved in the transport of ; this commodity. Three different gross vehicle weight (GVW) scenarios were selected for this study including: 80,000 lb., ; 100,000 lb. and 120,000 lb. The maximum current allowable GVW is 80,000 lb. while the maximum 100,000 lb. GVW is ; the permitted load for sugarcane trucks and is currently the highest load level permitted by Louisiana laws. ; The methodology for analyzing the effect of these loads on pavements was taken from the 1986 AASHTO Design Guide ; and involves determining the overlay thickness required to carry traffic from each GVW scenario for the overlay design ; period. Differences in the life of an overlay were calculated for different GVW scenarios and overlay thickness and costs ; were determined for a 20 year analysis period. These costs were developed for samples taken from all the control sections ; included in the study. These net present worth costs from the samples were expanded to represent the cost for all control ; sections carrying sugarcane. ; Results indicate that the damage from each sugarcane truck with a GVW of 100,000 lb. to pavement overlay is at about ; $2,072/year and to bridge fatigue cost is at about $3,500/year. Therefore, the current sugarcane trucks permit fee of $100 ; per year is not adequate and should be increased to recover these costs. The legislature should not consider raising the ; GVW level to 120,000 lb. because the pavement overlay costs increase by two folds (double) and the bridge repair costs ; become very large. Moreover, the magnitude of the damage caused by the 120,000 lb. GVW for a FHWA Type 9 truck ; makes the risk of bridge damage and even bridge failure too significant to ignore. The project staff recommends that the ; legislature keep the GVWs at the current level but increase the permit fees sufficiently to cover the additional pavement ; and bridge costs or change the configuration of the axle on the trailer from a tandem to a triple, effectively changing the ; vehicle from a FHWA Type 9 to a Type 10 vehicle. Under these circumstances, the permit fee can be reduced to zero and ; a tax incentive of $683 can be given to each truck for the conversion. It is recommended to allocate more highway ; funding for handling the extra damage caused by the increase of truck load limits.
  • Format:
    PDF
  • Funding:
  • Download URL:
  • File Type:
    Filetype[PDF - 332.79 KB]
  • Collection(s):
  • Main Document Checksum:
    urn:sha256:5a13e3932e8cdd5716437151897f051bec0179068136abf2af43ef40fb59d8b2
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.