Rister, B. W., & Graves, C. (2002). The Cost of Construction Delays and Traffic Control for Life-Cycle Cost Analysis of Pavements (Report No. KTC-02-07/SPR197-99 & SPR218-00-1F). University of Kentucky Transportation Center. https://rosap.ntl.bts.gov/view/dot/15861
Rister, Brad W. and Clark Graves. The Cost of Construction Delays and Traffic Control for Life-Cycle Cost Analysis of Pavements. Report no. KTC-02-07/SPR197-99 & SPR218-00-1F. University of Kentucky Transportation Center, 2002. https://rosap.ntl.bts.gov/view/dot/15861.
Rister, Brad W., and Clark Graves The Cost of Construction Delays and Traffic Control for Life-Cycle Cost Analysis of Pavements. University of Kentucky Transportation Center, 2002, Report no. KTC-02-07/SPR197-99 & SPR218-00-1F, ROSA P. https://rosap.ntl.bts.gov/view/dot/15861.
The objective of this report is to provide the Kentucky Transportation Cabinet a reliable approach to quantifying/calculating "Road User Cost"--often referred to as total user delay costs. To meet this objective, this report is divided into three main sections. The first section summarizes the reviews of three relatively new computer programs that can be used to help quantify delayed traffic incurred by the presence of a work zone. From this review, one program was selected based on its user friendliness and ability to define both quantity of delayed traffic and queue length. The second section compares actual field data to the output of the selected program to help determine the program's reliability/predictability in determining both quantity of delayed traffic and queue lengths. The last section summarizes typical hourly user cost rates by vehicle type (i.e.: vehicle operating costs, delay costs, and accident/crash costs) that have been used by other agencies. By combining the output from the selected program, and these typical user cost rates, one may be able to determine the total user delay costs associated with a highway construction project. 46 p.
Rister, B. W., & Graves, C. (2002). The Cost of Construction Delays and Traffic Control for Life-Cycle Cost Analysis of Pavements (Report No. KTC-02-07/SPR197-99 & SPR218-00-1F). University of Kentucky Transportation Center. https://rosap.ntl.bts.gov/view/dot/15861
Rister, Brad W. and Clark Graves. The Cost of Construction Delays and Traffic Control for Life-Cycle Cost Analysis of Pavements. Report no. KTC-02-07/SPR197-99 & SPR218-00-1F. University of Kentucky Transportation Center, 2002. https://rosap.ntl.bts.gov/view/dot/15861.
Rister, Brad W., and Clark Graves The Cost of Construction Delays and Traffic Control for Life-Cycle Cost Analysis of Pavements. University of Kentucky Transportation Center, 2002, Report no. KTC-02-07/SPR197-99 & SPR218-00-1F, ROSA P. https://rosap.ntl.bts.gov/view/dot/15861.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.