Very-Early-Strength Latex-Modified Concrete Overlays
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Very-Early-Strength Latex-Modified Concrete Overlays

Filetype[PDF-812.45 KB]


English

Details:

  • Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    This report describes the installation and condition of the first two very-early-strength latex-modified concrete (LMC-VE) overlays to be constructed for the Virginia Department of Transportation. The overlays were prepared with a special blended cement rather than the type I/II cement used in the conventional latex-modified concrete (LMC) overlay. Mixture proportions, installation equipment, and procedures are similar to those used for conventional LMC overlays with the exception that the contractor must work faster because the concrete loses slump rapidly and the curing period is only 3 hours rather than 72. Tests of the compressive strength of the LMC-VE overlay performed during the early hours after installation indicated that traffic could be placed on the overlay within 3 hours rather than the 4 to 7 days required for the conventional LMC overlay. Tests of the bond strength and permeability to chloride ion indicate that the overlays are performing satisfactorily. Pending continuing favorable test results, it is anticipated that LMC-VE overlays can be used in situations in which it is desirable to accelerate construction, to reduce inconvenience to motorists, to allow for installation during off-peak traffic periods such as at night, to provide a more rapid cure in cold weather, to provide low permeability (compared to concrete without latex), and to provide high strength, particularly, high early strength.
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov