Field Evaluation of Fracture Control in Tunnel Blasting
-
1979-12-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The objective of this research was to implement fracture control procedures in a tunnel project and to assess the practicality, advantages, disadvantages, performance and cost effectiveness of fracture control methods against smooth blasting procedures. This report describes the procedures and results of field tests of fracture control--a procedure for achieving fracture plane control in tunnel blasting. It describes and discusses the project and site geology, the theory and applications of fracture control blasting, and the experimental procedures used. The report provides conclusions and recommendations for future research. The procedures and results of an experimental smooth blasting round utilizing milli-second delay detonating caps are described in Appendix A.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: