Economics of Concrete and Wood Tie Track Structures
-
1978-08-01
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This report presents results from an evaluation of the economic benefits of concrete- versus wood-tie track. The analysis includes the life-cycle capital, maintenance, and renewal costs for concrete- and wood-tie track for four specific test cases and traffic ranges from 15 to 40 annual million gross tons (MGT). The sensitivity of the justifiable first cost of concrete ties as a function of parametric changes in service and maintenance variables has also been determined.
-