Northeast Corridor Improvement Project Electrification - New Haven, CT to Boston, MA : Draft Environmental Impact Statement/Report. Volume 3.
-
1993-10-01
Details:
-
Alternative Title:Technical Studies
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume III) of the FEIS/R presents summaries of comments received on the DEIS/R and responses to these comments.
This volume contains the detailed technical studies that were performed in order to identify and evaluate the environmental impacts of the proposed project. Some of these studies have been included entirely in the DEIS/R (Volume 1). The technical evaluations performed were based upon regulatory requirements as well as substantive issues raised by individuals and public agencies as part of the public participation program. Technical studies were performed for each of the following disciplines: Land use and recreation; transportation and traffic; socioeconomic; historic resources; archaeological resources; air quality; public health; public safety; energy; noise and vibration.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: