Bradshaw, A. S., & Baxter, C. D. P. (2006). Design and construction of driven pile foundations--lessons learned on the Central Artery/Tunnel project (Report No. FHWA-HRT-05-159). Turner-Fairbank Highway Research Center. https://rosap.ntl.bts.gov/view/dot/1010
Bradshaw, Aaron S. and Christopher D. P. Baxter. Design and construction of driven pile foundations--lessons learned on the Central Artery/Tunnel project. Report no. FHWA-HRT-05-159. Turner-Fairbank Highway Research Center, 2006. https://rosap.ntl.bts.gov/view/dot/1010.
Bradshaw, Aaron S., and Christopher D. P. Baxter Design and construction of driven pile foundations--lessons learned on the Central Artery/Tunnel project. Turner-Fairbank Highway Research Center, 2006, Report no. FHWA-HRT-05-159, ROSA P. https://rosap.ntl.bts.gov/view/dot/1010.
Five contracts from the Central Artery/Tunnel (CA/T) project in Boston, MA, were reviewed to document issues related to design and construction of driven pile foundations. Given the soft and compressible marine clays in the Boston area, driven pile foundations were selected to support specific structures, including retaining walls, abutments, roadway slabs, transition structures, and ramps. This report presents the results of a study to assess the lessons learned from pile driving on the CA/T. This study focused on an evaluation of static and dynamic load test data and a case study of significant movement of an adjacent building during pile driving. The load test results showed that the piles have more capacity than what they were designed for. At the site of significant movement of an adjacent building, installation of wick drains and preaugering to mitigate additional movement proved to be ineffective. Detailed settlement, inclinometer, and piezometer data are presented.
Bradshaw, A. S., & Baxter, C. D. P. (2006). Design and construction of driven pile foundations--lessons learned on the Central Artery/Tunnel project (Report No. FHWA-HRT-05-159). Turner-Fairbank Highway Research Center. https://rosap.ntl.bts.gov/view/dot/1010
Bradshaw, Aaron S. and Christopher D. P. Baxter. Design and construction of driven pile foundations--lessons learned on the Central Artery/Tunnel project. Report no. FHWA-HRT-05-159. Turner-Fairbank Highway Research Center, 2006. https://rosap.ntl.bts.gov/view/dot/1010.
Bradshaw, Aaron S., and Christopher D. P. Baxter Design and construction of driven pile foundations--lessons learned on the Central Artery/Tunnel project. Turner-Fairbank Highway Research Center, 2006, Report no. FHWA-HRT-05-159, ROSA P. https://rosap.ntl.bts.gov/view/dot/1010.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.