Search Results

Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

Narrow Results:
Publication Year
Resource Type
People
Organizations
Publisher
Series
Keywords
  • x
    Performance measurement (1376)
Report Number
Funding Number
x Performance Measurement
  • Mobility for the People Evaluating Equity Requirements in Shared Mobility Programs
    Mobility for the People: Evaluating Equity Requirements in Shared Mobility Programs
    :
    :
  • Safety of HighSpeed Ground Transportation Systems Human Factors Phase II Design and Evaluation of Decision Aids for Control of HighSpeed Trains Experiments and Model
    Safety of High-Speed Ground Transportation Systems: Human Factors Phase II: Design and Evaluation of Decision Aids for Control of High-Speed Trains: Experiments and Model
    :
    :
  • Diagnosing the Marine Transportation System Measuring Performance and Targeting Improvement  Conference Proceedings
    Diagnosing the Marine Transportation System: Measuring Performance and Targeting Improvement – Conference Proceedings
    :
    :
  • FMCSA Safety Program Effectiveness Measurement Carrier Intervention Effectiveness Model CIEM Version 13 Report for Fiscal Years 2017 and 2018 Interventions
    FMCSA Safety Program Effectiveness Measurement: Carrier Intervention Effectiveness Model (CIEM), Version 1.3 Report for Fiscal Years 2017 and 2018 Interventions
    :
    :
  • Research notes  retroreflectivity  how Oregon signs measure up
    Research notes : retroreflectivity , how Oregon signs measure up.
    :
    :
  • Snow Snake Performance Monitoring
    Snow Snake Performance Monitoring
    :
    :
  • NCHRP project 2007task 361  hamburg wheeltrack test equipment requirements and improvements to AASHTO T 324  research project capsule
    NCHRP project 20-07/task 361 : hamburg wheel-track test equipment requirements and improvements to AASHTO T 324 : research project capsule.
    :
    :
  • Shale embankment construction criteria  experimental feature interim report
    Shale embankment construction criteria : experimental feature interim report.
    :
    :
  • Pilot Testing of SHRP 2 Reliability Data and Analytical Products Southern California
    Pilot Testing of SHRP 2 Reliability Data and Analytical Products: Southern California
    :
    :
  • Meaningful Performance Measures for the Vehicle Size and Weight Programs That Are Useful for All Stakeholders Investigating of Meaningful Performance Measures for Vehicle Size and Weight Enforcement
    Meaningful Performance Measures for the Vehicle Size and Weight Programs That Are Useful for All Stakeholders: Investigating of Meaningful Performance Measures for Vehicle Size and Weight Enforcement
    :
    :
  • Tack Coat Installation Performance Guidelines
    Tack Coat Installation Performance Guidelines
    :
    :
  • Traffic Performance Assessment of Disrupted Roadway Networks Following Hazards
    Traffic Performance Assessment of Disrupted Roadway Networks Following Hazards
    :
    :
  • Actions and Accomplishments of the CMTS August 1 2017  July 31 2018
    Actions and Accomplishments of the CMTS: August 1, 2017 – July 31, 2018
    :
    :
  • Development of a TravelTime Reliability Measurement System
    Development of a Travel-Time Reliability Measurement System
    :
    :
  • Signal Performance Measures Pilot Implementation
    Signal Performance Measures Pilot Implementation
    :
    :
  • Alerts and Cues for Specific Conditions Analysis and Application in Training
    Alerts and Cues for Specific Conditions: Analysis and Application in Training
    :
    :
  • Actions and Accomplishments of the CMTS August 1 2018  July 31 2019
    Actions and Accomplishments of the CMTS, August 1, 2018 – July 31, 2019
    :
    :
  • Data Analytics and Evaluation of the Gainesville Trapezium Connected Vehicle Signal Phasing and Timing SPaT Deployment Project
    Data Analytics and Evaluation of the Gainesville Trapezium Connected Vehicle Signal Phasing and Timing (SPaT) Deployment Project
    :
    :
  • Measurement Tools for Assessing Motor Vehicle Division PortofEntry Performance
    Measurement Tools for Assessing Motor Vehicle Division Port-of-Entry Performance
    :
    :
  • 2009 YearEnd Accomplishment Summaries
    2009 Year-End Accomplishment Summaries
    :
    :
1 - 20 / 1376
Next
Sort By: