- Berger, C. 2
- Gordon, R. 2
- Scott, J. 2
- Zove, P. 2
- Sperry Systems Management (5)
- United States. Department of Transportation 2
- United States. Department of Transportation. Federal Highway Administration 1
- United States. Department of Transportation. Federal Highway Administration. Offices of Research and Development 2
- United States. Federal Highway Administration. Offices of Research & Development 2
- Analysis 2
- Automation 2
- Benefit cost analysis 2
- Bus priority 1
- Communications 2
- Control systems 2
- Costs 2
- Databases 2
- Data communications 2
- Design 2
- Driver information systems 2
- Feasibility analysis 2
- Freeways 2
- Handbooks 2
- Highway traffic control 2
- Maintenance 1
- Radio 2
- Radio control 2
- Route choice 2
- Specifications 2
- Systems engineering 2
- Telecommunications 2
- Traffic control 3
- Traffic control centers 2
- Traffic surveillance 2
- Transportation operations 1
- Urban areas 2
- Urban transportation 3
(Max 200)
- United States. Department of Transportation (2)
- United States. Department of Transportation. Federal Highway Administration (1)
- United States. Department of Transportation. Federal Highway Administration. Offices of Research and Development (2)
- United States. Federal Highway Administration. Offices of Research & Development (2)
- Analysis (2)
- Automation (2)
- Benefit cost analysis (2)
- Bus priority (1)
- Communications (2)
- Control systems (2)
- Costs (2)
- Databases (2)
- Data communications (2)
- Design (2)
- Driver information systems (2)
- Feasibility analysis (2)
- Freeways (2)
- Handbooks (2)
- Highway traffic control (2)
- Maintenance (1)
- Radio (2)
- Radio control (2)
- Route choice (2)
- Specifications (2)
- Systems engineering (2)
- Telecommunications (2)
- Traffic control (3)
- Traffic control centers (2)
- Traffic surveillance (2)
- Transportation operations (1)
- Urban areas (2)
- Urban transportation (3)
- :Zove, P. ;Berger, C.1978-05-01:Phase I of the IMIS project examined the feasibility of implementing an Integrated Motorist Information System in a corridor located in New York (nort...
- :Zove, P. ;Berger, C.1978-05-01:Phase I of the IMIS project examined the feasibility of implementing an Integrated Motorist Information System in a corridor located in New York (nort...
- :Scott, J. ;Gordon, R.1978-11-22:The goal of this study is to provide information that will be useful in reducing costs of future computerized urban traffic control systems. The final...
- :Scott, J. ;Gordon, R.1978-11-12:The goal of this study is to provide information that will be useful in reducing costs of future computerized urban traffic control systems. The final...
- :Sperry Systems Management1976-06-01:This report presents a comprehensive review of the UTCS/BPS operation and maintenance. The results and conclusions presented herein highlight system a...
Exit Notification/Disclaimer Policy
Thank you for visiting.
You are about to access a non-government link outside of the U.S. Department of Transportation's National Transportation Library.
Please note: While links to Web sites outside of DOT are offered for your convenience, when you exit DOT Web sites, Federal privacy policy and Section 508 of the Rehabilitation Act (accessibility requirements) no longer apply. In addition, DOT does not attest to the accuracy, relevance, timeliness or completeness of information provided by linked sites. Linking to a Web site does not constitute an endorsement by DOT of the sponsors of the site or the products presented on the site. For more information, please view DOT's Web site linking policy.
To get back to the page you were previously viewing, click your Cancel button.