National Airport Pavement Test Facility Construction Cycle 9: Volume 1 — Traffic Test Summary
-
2026-02-01
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:Construction Cycle 9 (CC9) was the ninth in a series of full-scale airport pavement tests performed at the Federal Aviation Administration (FAA) National Airport Pavement Test Facility (NAPTF), and the fifth involving flexible pavements. It consisted of ten flexible pavement test items assigned to four test areas: (1) Fatigue Model and Base Course Thickness, (2) Geosynthetics, (3) Cement-Treated Permeable Base, and (4) Overload. Test items were constructed in 2019, and traffic testing took place between November 6, 2020, and April 2, 2024. This report contains a general description and summary of CC9 planning, construction, and test execution. Detailed results and analyses of the individual tests are contained in separate volumes.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:11af4583a2f13378beb0556a389f195f35c3d41967791fc018318358fe33bc386e1613e0a60f85a47cac3b590c3a227aa2312f492a283054cd7a02ae37169811
-
Download URL:
-
File Type: