Experimental Evaluation Final Report: Thin-Whitetopping Bonded Composite [2008]
-
2008-08-01
Details
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Seventh year analysis of experimental thin-whitetopping (TW) construction project consisting of milling approximately 38mm of Asphalt Cement (AC) and placement of 100mm Portland Cement (PCCP) onto the milled surface to create a bonded, composite pavement. Project length-0.0 kilometer (0.6 mile).
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:80027c46ed221725b942d2bbf743de58183d76824d5e466ef7d934ffe75cf22b328e90c3784e6b644b17a032242b616902b7d457db26c45728b7248e38102412
-
Download URL:
-
File Type: