Highway concrete pavement technology development and testing : volume IV, field evaluation of Strategic Highway Research Program (SHRP) C-206 test sites (early opening of full-depth pavement repairs).
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Highway concrete pavement technology development and testing : volume IV, field evaluation of Strategic Highway Research Program (SHRP) C-206 test sites (early opening of full-depth pavement repairs).

Filetype[PDF-1.10 MB]


  • English

  • Details:

    • Alternative Title:
      Field evaluation of Strategic Highway Research Program (SHRP) C-206 test sites (early opening of full-depth pavement repairs)
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • OCLC Number:
      769138569
    • Edition:
      Final report.
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-Pavement Management and Performance;NTL-HIGHWAY/ROAD TRANSPORTATION-Materials;NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance;
    • Abstract:
      The objective of this study was to monitor and evaluate the performance of experimental full-depth repairs made with high-early-strength (HES) materials placed under Strategic Highway Research Program (SHRP) project C-206, Optimization of Highway Concrete Technology. The C-206 full-depth repair experiment was conducted to demonstrate and validate the technologies that allow early opening of full-depth portland cement concrete (PCC) pavement repairs to traffic and to document the information needed to apply this technology. The experimental factors for the full-depth repair experiment included material type, strength at opening, and repair length. A total of 11 different HES concrete mixes with opening times ranging from 2 to 24 hours were evaluated at 2 field sites (U.S. I-20, Augusta, GA and State Route 2, Vermilion, OH).

      The scope of this study included 5-year monitoring of SHRP C-206 full-depth experiment sections, analyzing the data, and revising the guidelines for early opening of full-depth PCC pavement repairs as needed. The monitoring program consisted of annual visual distress surveys to monitor the development of cracking, faulting, and spalling. The annual surveys were conducted from the fall of 1994 through the fall of 1998. The results of this evaluation showed that full-depth repairs made with HES PCC can provide good long-term performance; however, adverse temperature conditions during installation can cause premature failures. Extremely high PCC temperatures during curing should also be avoided. The fatigue damage due to early opening is negligible, especially for repairs of 3.7 m or shorter. Within the range of strength evaluated under SHRP C-206, the strength at opening could not be correlated to performance. Based on the results of this evaluation, no changes are recommended to the opening criteria suggested in the SHRP C-206 manual of practice.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26