Upgrading Deficient Through Truss Bridges
-
1983-04-01
Details
-
Alternative Title:Innovative Methods of Upgrading Structurally and Geometrically Deficient Through Truss Bridges
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:This study consists of (a) investigation of current practices in several states to upgrade truss bridges; (b) literature search for state-of-the-art perspective; (c) evaluation of information from the FHWA bridge inventory; and (d) search for examples of truss bridge rehabilitation. The information is used to develop and evaluate various methods to rehabilitate through truss bridges. Methods or rehabilitation are formulated, analyzed and designed to suit the most general condition of truss bridges. Several problems exist with through truss bridges; these are presented in the report. The methods are applied to the one existing, typical bridge to demonstrate proposed methods, and to identify problems, limitations, and construction procedure as applied to actual bridges. Both specifications and drawings are included, and cost comparisons between rehabilitation and replacement are made. Recommendations for future research are given.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:cccffb72167bc61788410dd73c73ed822f49b0354988ccd185ea237db83c349c1ae0ca5856483f76efd967b9839412a7935e3ef661b696e403f996952b4958a9
-
Download URL:
-
File Type: