Phase 1 Systems Engineering Management Plan: Heart of Iowa Regional Transit Agency ITS4US Deployment Project
-
2022-04-22
-
-
Series: ITS4US Phase 1
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Series:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final, Phase 1 (3/2021-2/2022)
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:The Heart of Iowa Regional Transit Agency (HIRTA) is one of the 5 awardees for Phase 1 of the Complete Trip – ITS4US contract for its proposed concept “Health Connector for the Most Vulnerable: An Inclusive Mobility Experience from Beginning to End” (Health Connector) by the United States Department of Transportation (USDOT). The HIRTA Team previously developed a Concept of Operations (ConOps) document after going through a thorough stakeholder engagement process. The ConOps defines user needs and identifies relevant user scenarios for the Health Connector solution. The Systems requirements (SyRS) document was developed based on ConOps to define requirements for the Health Connector system. The Systems Engineering Management Plan (SEMP) document is the foundational document for system Lifecyle management in Phase 2/3 and beyond. It has been developed using details of the project established so far in Phase 1, and defines how the system deployment process will be managed through design, testing and launch in Phase 2. The document also provides relevant details on planned development work. Further, SEMP defines how operations and maintenance activities will be performed in Phase 3 and beyond. SEMP is a living document and will be updated as details emerge through the rest of Phase 1 and in Phase 2/3.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: