Phase 1 System Requirements Specification (SyRS) — Heart of Iowa Regional Transit Agency ITS4US Deployment Project
-
2022-01-24
-
Series: ITS4US Phase 1
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Series:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final, Phase 1 (3/2021-2/2022)
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:The Heart of Iowa Regional Transit Agency (HIRTA) is one of the 5 awardees for Phase 1 of the Complete Trip – ITS4US contract for its proposed concept “Health Connector for the Most Vulnerable: An Inclusive Mobility Experience from Beginning to End” (Health Connector) by the United States Department of Transportation (USDOT). The HIRTA Team previously developed a Concept of Operations (ConOps) document after going through a stakeholder engagement process. The ConOps defines user needs and identifies relevant user scenarios for the Health Connector solution. The Systems requirements (SyRS) document builds on the needs and scenarios developed in the ConOps and develops requirements in this document. These requirements define system functionalities, identify performance criteria, define requirements for the interfaces with external systems and identify data and reporting needs along with other requirements for usability, security and infrastructure. Further, this document provides a matrix indicating traceability between requirements and user/system needs.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: