External Post-Tensioning Anchorage [Summary]
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

External Post-Tensioning Anchorage [Summary]

Filetype[PDF-443.75 KB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      The integrity of many concrete bridge components depends on posttensioning (PT). This technology extends the material properties of concrete and gives engineers additional flexibility in bridge design. However, PT depends on the properties of steel, which can corrode, especially in bridge designs, which places PT parts in watery and, often, salty environments. This hazard was highlighted in 2000, when a routine inspection of the Mid-Bay Bridge over Choctawhatchee Bay in Okaloosa County revealed that the polyethylene duct of one of the bridge’s tendons had cracked. Further inspection of the Mid-Bay Bridge found several fractured tendon strands. This prompted an inspection of all the bridge’s 141 spans. One of the bridge’s tendons had completely slacked. Work began immediately to determine failure mechanisms and to develop design procedures to provide an additional margin of safety in the design of segmental bridges, which typically employ post-tensioning. Better designs for bonded PT systems could provide secondary anchorage when primary anchorage fails, creating a safety margin and giving bridge owners time to properly address repair issues. Researchers from the University of Central Florida studied PT systems with the goal of determining a reliable transfer length to provide anchorage for the PT tendons based on the grout interface with both tendons and steel casing pipe. The problem of anchoring the pipe in the expansion joint pier segment concrete is a separate problem. In their literature review, researchers investigated the code provisions that control design of PT and prestressed systems and set limits on transfer lengths. Variables in the design equations that can affect transfer length were identified. Previous work on tendon-cementitious material interfaces was also reviewed. These reviews set the parameters for the study, and a program of experiments was developed, including test fixture design, testing protocols, and data analysis. Experiments used 7-, 12-, and 19-strand tendons. In addition to testing different tendon sizes and different bonded lengths, tendons were stressed to different levels of the strand’s guaranteed ultimate tensile strength to identify transfer and development behavior. In all, nine specimens with straight ducts housing the bonded tendons were tested. Researchers concluded the study with recommendations about transfer lengths for 7- and 12-strand tendons that would provide secondary anchorage. Manufacturer-specified (VSL, Inc.) anchorages were able to develop a ductile failure mechanism in the specimens that experienced slippage (tendon in grout and grout in casing) during active loading. However, for 19-strand specimens, the casing pipe did not have sufficient strength to allow this mechanism to form, and brittle failure occurred with the given test setup.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26