Post‐Installation Evaluation of the Effects of Ramp Metering in North Carolina
-
2019-02-01
-
Details:
-
Alternative Title:Planning Level Evaluation of the Effects of Ramp Metering on North Carolina Freeways Final Report [Cover title]
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Project Report, August 2017 to February 2019
-
Corporate Publisher:
-
Abstract:Since September 2017, the first four on‐ramp signals in North Carolina, positioned on the westbound lanes of I‐540 in Wake County, have been regularly activated Monday to Friday from 6:30 ‐ 9am. This report focused on the impact of these on‐ramp signals. The results identified are the product of data collected in the I‐540 WB area over multiple years from numerous sources, both before and after on‐ramp signals. When feasible, the costs and benefits of the on‐ramp signals were monetized using benefit cost analysis methods. The results of this study show that the on‐ ramp signals resulted in benefits including a forecasted net savings of $7,949,541 over the ten years after the installation of the on‐ramp signals. In addition, the analytical methods updated and developed through this study will provide North Carolina Department of Transportation (NCDOT) with planning and evaluation frameworks that can be readily applied to future on‐ramp signal projects. In the future, NCDOT can use the planning‐level tools to evaluate the potential of implementing on‐ramp signals in other locations in the state and can apply the evaluation tools to assess the impacts of the on‐ramp signals after installation. Ultimately, the methods, processes, and lessons learned delivered with this study can help North Carolina save make faster and more accurate decisions about future on‐ramp signal projects.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: