Parametric Functions for Conceptual and Feasibility Estimating in Public Highway Project Portfolios
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Parametric Functions for Conceptual and Feasibility Estimating in Public Highway Project Portfolios

Filetype[PDF-1.77 MB]


  • English

  • Details:

    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      Owners face challenges in setting priorities between potential projects to maintain, rehabilitate, and improve their infrastructure. The estimated cost of each potential project is a factor that owners use in setting priorities between projects and in developing their long-term maintenance and construction project portfolio. Owners face a dilemma: considerable effort is needed to develop accurate estimates of the cost of each project, but this effort will be wasted if the particular project is not selected for the long-term plan. They therefore need estimating methods that will enable them to develop reasonably accurate early stage cost estimates without an excessive amount of effort. These early stage estimates are “conceptual cost estimates” and “feasibility cost estimates.” This research examines the tools that are available to owners for performing early stage cost estimates for infrastructure projects. It then compares alternative parametric functions that could be used for that purpose, using data from public agencies in California. These functions are the linear parametric, common exponential parametric, and modified Cobb-Douglas exponential parametric models. This research tests the models on 1 common type of project, pedestrian access facility projects on highways. In the United States (US) these projects result, directly and indirectly, from the Americans with Disabilities Act (ADA) that Congress passed in 1990. On highways, they produce three types of improvement: 1. wheelchair ramps at street corners to allow people in wheelchairs to cross streets at designated pedestrian crossings, 2. wheelchair-accessible sidewalks, and 3. audible signals at signalized intersections to inform visually impaired people when a pedestrian signal is in their favor. The author developed a data set of 39 pedestrian access facility projects on state highways in California, used multiple regression analysis to find 4 best-fit versions of each of the 3 functions (i.e., 12 alternatives in all), and evaluated them using the Choosing By Advantages (CBA) method. The author then benchmarks the preferred state highway cost estimating model identified in the CBA against 10 city-street pedestrian access facility projects that had been completed by 4 cities in the San Francisco Bay Area.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26