U.S. DOT Gulf Coast Study, Phase 2, Engineering Case Study 2: Bridge Over Navigable Waterway Exposure to Sea Level Rise
-
2015-01-01
Details:
-
Corporate Creators:
-
Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This is one of 11 engineering case studies conducted under the Gulf Coast 2, Phase 2 Project. This case study focused on the vulnerability of the Cochrane-Africatown USA Bridge over a navigable waterway exposed to sea level rise.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: