Applicability Determination: CMAQ Traffic Congestion and CMAQ On-Road Mobile Source Emissions Measures as of October 1, 2017.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Applicability Determination: CMAQ Traffic Congestion and CMAQ On-Road Mobile Source Emissions Measures as of October 1, 2017.

Filetype[PDF-448.57 KB]


English

Details:

  • Corporate Creators:
  • Subject/TRT Terms:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    The Federal Highway Administration (FHWA) is publishing this list of State Departments of Transportation (DOTs) and Metropolitan Planning Organizations (MPOs) who are required to establish targets and report progress for the performance measures related to the Congestion Mitigation and Air Quality Improvement Program (CMAQ). There are three measures covered within this document, as established in 23 CFR Part 490 (§ 490.707 and § 490.807): 1. Two measures related to traffic congestion: the peak hour excessive delay (PHED) measure and the non-single occupancy vehicle (non-SOV) measure. 2. One measure related to on-road mobile source emissions: the emissions measure. The tables contained within this document serve as the determination of applicability of the CMAQ traffic congestion and emissions measures for the first performance reporting period for these measures. (23 CFR 490.105(e)(8)(iii) and (e)(9)(v)) The first performance period for the on-road mobile source emissions measure begins on October 1, 2017, and continues through September 30, 2021. The performance period for the traffic congestion measures (peak hour excessive delay and non-single occupancy vehicle travel) begins on January 1, 2018, and runs through December 31, 2021. (23 CFR 490.105(e)(4))
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov