Detailed Monitoring Protocol For U.S. 95 Settlement Agreement
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Detailed Monitoring Protocol For U.S. 95 Settlement Agreement

Filetype[PDF-2.32 MB]


  • English

  • Details:

    • Corporate Creators:
    • Contributors:
    • Resource Type:
    • Geographical Coverage:
    • Contracting Officer:
    • Abstract:
      The purpose of this Detailed Protocol is to specify how to conduct the field studies called for by the Settlement Agreement, i.e., addressing the impact of mobile sources on PM2.5 and MSAT concentrations near highly traveled roadways. This Protocol has been developed to address all aspects of the field studies called for in the Settlement Agreement, including selection of the study location; placement and setup of sampling sites; application of appropriate sampling and analysis methods, including monitoring of surrogate or indicator compounds; coordination of chemical sampling with meteorological and traffic monitoring over defined sampling periods and study durations; quality assurance activities; and analysis of the study data. Furthermore, the Protocol defines and recommends the logistical process to be followed when more than one such field study is to be carried out, such that simultaneous or sequential studies can benefit from concurrent or previous efforts. The primary goal of this Protocol is to provide understandable and readily implementable procedures and guidance that can be used by any organization carrying out such a mobile source field study. It is expected that the multiple field studies required under the Settlement Agreement may be carried out by the FHWA or its contractor(s), or by state DOT’s or their contractors. Consequently, the Protocol is sufficiently detailed but widely applicable, so that field studies carried out by diverse agencies in widely different parts of the United States will have a consistent scope and produce data of comparable breadth and quality.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26