Contech Ribbed Aluminum Box Culvert (ABC): Experimental Project Construction Report and Final Evaluation
-
2017-01-01
Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Document all phases of the installation practice of the ABC unit. Issues such as special backfill required, installation of reinforcing ribs, equipment required, and construction loading will supplement the report. Monitor and report on long-term performance of the culvert and roadbed.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: