Next Generation 9-1-1 (NG9-1-1) System Initiative: Proof of Concept Deployment Plan: Version 1.0
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Next Generation 9-1-1 (NG9-1-1) System Initiative: Proof of Concept Deployment Plan: Version 1.0

Filetype[PDF-3.52 MB]


English

Details:

  • Alternative Title:
    Next generation 9-1-1 (NG9-1-1) system initiative
  • Corporate Creators:
  • Subject/TRT Terms:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    The U.S. Department of Transportation (USDOT) Next Generation 9-1-1 (NG9-1-1) Proof-of-Concept (POC) demonstration is envisioned to test key features and functionalities of the NG9-1-1 system. The Interim POC System Design Document defines the detailed system design of the POC demonstration test-bed. This document describes how the POC test-bed equipment will be deployed within the Booz Allen Hamilton, Texas A&M University, and Columbia University test laboratories and at selected Public Safety Answering Points (PSAP). It outlines detailed plans to develop and deploy software components required to successfully demonstrate the capabilities of the NG9-1-1 POC system design components. These include: Call origination software components for SIPc client, public switched telephone network (PSTN) gateway software, Internet Protocol (IP) gateway software, cellular gateway software, and telematics gateway software; NG9-1-1 databases such as Identity and Access Management (IdAM), Business Rules, Location-to-Service-Translation (LoST), and Call Record; Call receiving software components for IP-based Automatic Call Distribution (ACD) and Human Machine Interface (HMI). The plan includes a detailed timeline and milestones for developing, testing, and deploying the POC test-bed components. In addition, it lists the configuration management (CM), risk management, maintenance, training, and communication plans and procedures that will be used to ensure effective and efficient deployment of the POC test-bed components.
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov