ITS regional architecture for the Albuquerque metropolitan area (AMPA) : evaluation report.
-
2009-08-11
Details:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
NTL Classification:NTL-INTELLIGENT TRANSPORTATION SYSTEMS-INTELLIGENT TRANSPORTATION SYSTEMS
-
Abstract:The Albuquerque Metropolitan Planning Area (AMPA) Regional ITS Architecture is the
roadmap for transportation systems integration in the Albuquerque Metropolitan Area over the
next 20 years. This architecture was developed through a supportive effort by the AMPA’s
transportation agencies, which represents a common vision of how each agency’s systems, will
work together in the future, sharing information and resources to provide a safer, more efficient,
and more effective transportation system for travelers in the region.
The architecture is an important tool that is been used by:
· Operating Agencies to recognize and plan for transportation integration opportunities in
the AMPA as well as the larger state.
· Planning Agencies to better reflect integration opportunities and operational needs into
the transportation planning process.
· Other organizations and individuals that use the transportation system in the AMPA as
well as the larger state.
The architecture provides an overarching framework that spans all of these organizations and
individual transportation projects. Using the architecture, each transportation project can be
viewed as an element of the overall transportation system, providing visibility into the
relationship between individual transportation projects and ways to cost-effectively build an
integrated transportation system over time. The architecture also is coordinated with the New
Mexico Statewide ITS Architecture to ensure consistency at those jurisdictional and operational
points where AMPA based operations coincides and/or integrates with statewide planning and
operations.
The total cost for the development of the AMPA Regional ITS Architecture was $72,075.10.
This total cost was comprised of $67,350.20 for labor and $4,724.90 for direct expenses
according to the Mid-Region Council of Governments (MRCOG).
-
Format:
-
Alternate URL:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: