Research Notes: Rockfall Under Control
-
1986-04-01
Details:
-
Alternative Title:Rockfall under control
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:To compensate for the Detroit Dam site (non-uniform slope), the standard catch fence design was modified in three ways: rock bolts anchored the fence posts where jack hammering a standard 3-foot hole would have been too costly and difficult; a triple twist (Gabion [TM] type) wire mesh was used for the screen instead of chain link fencing; and the screen length was as long as 50 feet (instead of a standard 15 feet) because the top of the catch fence was located at a break in the slope. All modification proved quite successful on this project.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: