The objective of this research project was to evaluate the process and performance of lining an existing pipe culvert with a polyethylene pipe liner. The pipe liner used in this project is called Snap-Tite pipe liner. This process, referred to as pipe lining, was sought as an alternative to the conventional removal and replacement methods due to the fact that it is cost effective, minimizes disruptions to the traffic flow and has fewer possible impacts upon the environment. This project was located at SR 4018, Segment 50 Offset 800 in Erie County. In addition to adding the pipe liner, the liner was extended approximately 12 feet on the inlet side of the culvert so as to align the pipe with the stream and allow for flattening of the existing slope. The performance of the liner was monitored for buckling through yearly inspections for 4 years. Very little buckling was reported and a provisional special provision will be generated for Department use.
This USDOT PHMSA sponsored research project addressed and successfully determined the initial feasibility of using new materials, both polymeric and c...
Re-rounding is a technique for remediating excess deflection in a thermoplastic pipe using a pneumatic device vibrating along the vertical axis and pu...
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.