This report documents the finite element analysis of a bolted field splice connection from a hypothetical three-span continuous bridge with back spans 234 ft long, and a 300-ft center span. The connection was designed using a traditional approach and then by using a new simplified method that required fewer bolts for the web splice component. The results of the analysis demonstrated the efficacy of the new design method in that it did not result in overstressing of the girder or bolts at the strength limit state. In part because of this work, the American Association of State and Highway Transportation Officials voted in June 2016 to adopt a new design method for the design of bolted connections for steel bridges.
Steel twin tub girder (STTG) bridges (Figure 1) are a popular choice for dealing with long-spanned bridges in Texas, especially when tight-radii curve...
Two-girder steel bridges are classified as fracture critical bridges based on the definition given in the AASHTO LRFD Bridge Design Specifications. In...
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.