Integrated Corridor Management Analysis, Modeling, and Simulation Experimental Plan for the Test Corridor
-
2008-03-01
Details
-
Alternative Title:USDOT Integrated Corridor Management (ICM) Initiative: Integrated Corridor Management Analysis, Modeling, and Simulation Experimental Plan for the Test Corridor
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
- Transportation corridors
- Highway corridors
- Transportation planning
- Traffic models
- Analysis
- Performance measurement
- Simulation
- Integrated corridor management
- Modeling
- Analysis, Modeling, and Simulation
- AMS
- Test corridor
- Experimental plan
- Framework
- Model calibration
- Performance measures
- Analysis scenarios
- I-880 Corridor
- Macroscopic
- Mesoscopic
- Microscopic
- ICM
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:This document, the AMS Experimental Plan, lays out the scope of analysis that will be conducted through the application of the AMS methodology to the Test Corridor. The specific objectives of the Experimental Plan are: create an AMS framework that identifies strategies, scenarios, and procedures for tailoring AMS general approaches towards the Test Corridor; and specify the AMS framework, based on the analysis and application of existing tools, and integrating existing tools into an internally consistent and flexible system approach that is able to support the Test Corridor ICM functional requirements.
-
Format:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:daf5e775bd1978cc15eadd4795a07f3891e6cb20c716d76967da4f052421fa8fc5795ac1b51575ad66b0bd65cdc563693b6f9d35d9aba046084dea3485d9cea9