Magnetic Tomography - Assessing Tie Bar and Dowel Bar Placement Accuracy
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Magnetic Tomography - Assessing Tie Bar and Dowel Bar Placement Accuracy

Filetype[PDF-892.57 KB]


English

Details:

  • Creators:
  • Corporate Creators:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Edition:
    Final Report
  • Corporate Publisher:
  • Abstract:
    The Kansas Department of Transportation (KDOT) constructs portland cement concrete pavements (PCCP) for new highway expansions and/or for replacement of existing highway pavement using slip-form paving operations. Typical concrete pavement construction in Kansas requires reinforcing steel across the joints. Correct placement of reinforcing steel in the PCCP is critical for good performance and long life of highways. However, once immersed in the concrete paste, steel placement is difficult to measure with nondestructive methods. Sometimes the steel bars are inserted (placed) using automated equipment. If the insertion process isn’t accurate, such that the steel bars are mislocated, costly remedial action can be required. Timely detection of misplaced steel would provide feedback needed to correct the construction process. To address this need, KDOT developed a field instrument capable of non-destructively assessing the placement (depth and orientation) accuracy of reinforcing steel in PCC pavement using magnetic tomography technology with real time feedback. Several iterations of prototype carts were developed. The final prototype cart developed and constructed used two sensors to determine the steel location. The long-term direction for this research project was to develop an instrument capable of efficiently assessing the real-time placement accuracy of reinforcing steel in slip-form PCCP paving operations. However, the project was discontinued when the sensor supplier’s modified sensor boards weren’t reliable, their customer service was less than desired, and no alternate sensor suppliers were available.
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov