USDOT Guidance Summary for Connected Vehicle Deployments : System Requirements and the CVRIA/Set-It Tool : Final Report
-
2016-07-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final report
-
Corporate Publisher:
-
Abstract:This document provides guidance material in regards to System Requirements for the CV Pilots Deployment Concept Development Phase. Methods for system engineering are discussed with definitions for the successful management of each aspect. Important references are given in terms of Laws and Regulations, in-text footnotes, and additional guidance documents. How system engineering ties into the Concept Development Phase deliverables is discussed with a focus on the Tasks 2 and 6. Major challenges are identified and how they can be overcome. The document concludes with a summary of available CV systems engineering training.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: