GASB Statement 34 Compliance: Development of a Fixed Asset (Infrastructure) MIS, Phase 1
-
2002-01-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This project defined the scope, goals, and high-level requirements for the Alabama Department of Transportation's Asset Management System, so that it will comply with the General Accounting Standards Board policy 34. The system will provide a network-level planning tool for needs analysis and resource allocation, and will evaluate the impacts of variations in funding levels. The objectives of the new system are to institutionalize data collection, validation, and storage; assure internal consistency of the data; leverage current information systems; provide reporting and information retrieval that is timely and distinct (providing ad-hoc and drill down decision support); conduct comparable analyses between years; enhance existing algorithms and projections and enhance intuitive analysis through visualization.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: