I-75 Corridor Incident Management Plan [IMPLAN: Volume I, 1994]
-
1994-09-26
-
By Rockwell International ...
Details:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:In 1993, the Michigan Department of Transportation, supported by the Federal Highway Administration, sponsored a study, Metro Detroit Early Deployment Project. Rockwell International served as Prime Contractor, with Dunn Engineering Associates and Hubbell, Roth and Clark, Inc., serving as subcontractors. This study required the development of a plan for a Quick Step, an early action IVHS project. That plan is documented in Early Deployment of ATMS/ATIS for Metropolitan Detroit, dated February 15, 1994. In addition, the study required that the contractor develop: a model for preparing a detailed incident management plan; the test and validation of the model on a specific freeway segment; and, a Comprehensive Incident Response Plan.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: