Long-term performance of a hot in-place recycling project final report.
-
2016-08-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final report
-
Corporate Publisher:
-
Abstract:This report documents the construction and long-term performance of a hot in-place recycled (HIPR)
project on SR 542. HIPR project selection, mix design, construction and testing are described. It was shown that
the HIPR process successfully rehabilitated the pavement using less new material than a traditional HMA mill and
fill while reducing project costs and traffic disruptions as compared to conventional HMA construction. The
roadway met the design criteria according to the Asphalt Recycling and Reclaiming Association.
Performance of the HIPR was monitored for 6 years using periodic photos of the pavement and data from
the Washington State Pavement Management System (WSPMS). The HIPR pavement after construction was
observed to have an open texture and dry appearance, possibly due to inadequate asphalt binder content. The
pavement is currently characterized by a raveled surface with alligator and longitudinal cracking at various
locations. The poor performance has been attributed to insufficient asphalt binder in the HIPR mix. The HIPR
process may have been a contributing factor due to aging of the binder in the existing pavement, but was not the
primary cause of the pavement’s poor performance.
Due to the poor condition of the pavement a chip seal is programmed for 2018. A life cycle cost analysis
showed the HIPR to have an annual per lane mile cost $3,700 more than a conventional 0.15’ mill and fill HMA
pavement.
-