Allen, A., & Goodspeed, C. (2015). The future of rapid bridge deck replacement (Report No. FHWA-NH-RD-15680X). New Hampshire. Dept. of Transportation. Bureau of Materials and Research. https://rosap.ntl.bts.gov/view/dot/29471
Allen, Anabelle and Charles Goodspeed. The future of rapid bridge deck replacement. Report no. FHWA-NH-RD-15680X. New Hampshire. Dept. of Transportation. Bureau of Materials and Research, 2015. https://rosap.ntl.bts.gov/view/dot/29471.
Allen, Anabelle, and Charles Goodspeed The future of rapid bridge deck replacement. New Hampshire. Dept. of Transportation. Bureau of Materials and Research, 2015, Report no. FHWA-NH-RD-15680X, ROSA P. https://rosap.ntl.bts.gov/view/dot/29471.
Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose
;
inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction
;
techniques often use precast members to reduce the duration of construction and the resultant disruption to traffic
;
patterns.
;
This project considered various technical, safety, and economic challenges in the design and construction of a full-width precast concrete slab with a centerline crown. Torque verified leveling screws compensated for girder, deck
;
panel prefabrication tolerances, and dead load deflections. In addition, the uniform-depth deck slab was cast by
;
conventional prestressing fabricators. The method to lift and transport the slabs was considered to prevent damage.
;
Accelerated bridge construction is less expensive and bridge work can be c
Allen, A., & Goodspeed, C. (2015). The future of rapid bridge deck replacement (Report No. FHWA-NH-RD-15680X). New Hampshire. Dept. of Transportation. Bureau of Materials and Research. https://rosap.ntl.bts.gov/view/dot/29471
Allen, Anabelle and Charles Goodspeed. The future of rapid bridge deck replacement. Report no. FHWA-NH-RD-15680X. New Hampshire. Dept. of Transportation. Bureau of Materials and Research, 2015. https://rosap.ntl.bts.gov/view/dot/29471.
Allen, Anabelle, and Charles Goodspeed The future of rapid bridge deck replacement. New Hampshire. Dept. of Transportation. Bureau of Materials and Research, 2015, Report no. FHWA-NH-RD-15680X, ROSA P. https://rosap.ntl.bts.gov/view/dot/29471.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.