Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose
inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction
techniques often use precast members to reduce the duration of construction and the resultant disruption to traffic
patterns.
This project considered various technical, safety, and economic challenges in the design and construction of a full-width precast concrete slab with a centerline crown. Torque verified leveling screws compensated for girder, deck
panel prefabrication tolerances, and dead load deflections. In addition, the uniform-depth deck slab was cast by
conventional prestressing fabricators. The method to lift and transport the slabs was considered to prevent damage.
Accelerated bridge construction is less expensive and bridge work can be c
New Hampshire. Dept. of Transportation. Bureau of Materials and Research
2006-06-13
Abstract:
One of the greatest impacts associated with bridge rehabilitation is the lengthy disruption of traffic flow. Cast-in-place concrete construction is a ...
The Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that woul...
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.