Statewide shoulders study : executive summary.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Statewide shoulders study : executive summary.

Filetype[PDF-1.18 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      With the ultimate purpose of enhancing safety and improving mobility, the Statewide Shoulders Study was initiated to

      develop a prioritized list of candidate locations for shoulder improvements. The need for this study stems directly from

      ADOT’s desire to increase safety and mobility along the Arizona State Highway System. The project purpose is

      demonstrated with the following statement of need:

       Create Methodology. As the first statewide, shoulder improvement prioritization project conducted in Arizona,

      a methodology needs to be developed that utilizes available data to accurately identify deficiencies. A

      statewide and district-level prioritization is needed in order to appropriate limited funds for priority projects.

       Develop List of Shoulder Improvement Locations. Currently, there is no statewide or ADOT Engineering

      District-wide listing of prioritized locations for shoulder improvement projects. This document will serve as guidance for determining priority roadway segments within each ADOT District and throughout the State that

      require funding.

       Develop Feasible, Cost Effective Implementation Plan. High priority projects need to be evaluated for

      feasibility and cost-effectiveness. Due to limited funding, innovative and cost effective alternatives beyond

      traditional pavement applications need to be explored.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26