White, D. W., Teizer, J., Fang, Y., Nguyen, T. V., & Jarriell, R. (2014). Best management practices for storage of historic metal truss bridges (Report No. GA-14-1205). Georgia. Department of Transportation. Office of Research. https://rosap.ntl.bts.gov/view/dot/28650
White, Donald W., Jochen Teizer, Yihai Fang, Thanh V. Nguyen, and Ryan Jarriell. Best management practices for storage of historic metal truss bridges. Report no. GA-14-1205. Georgia. Department of Transportation. Office of Research, 2014. https://rosap.ntl.bts.gov/view/dot/28650.
White, Donald W., et al. Best management practices for storage of historic metal truss bridges. Georgia. Department of Transportation. Office of Research, 2014, Report no. GA-14-1205, ROSA P. https://rosap.ntl.bts.gov/view/dot/28650.
As part of a 2002 agreement with the FHWA, GDOT has committed to consider storing metal truss
;
bridges of historic value in lieu of demolition, until a recipient could be located. This research addresses the most
;
effective processes for storage of historic metal truss bridges until a reuse can be determined. The design and
;
material integrity of the bridge must be retained. The report first reviews the conditions leading to the decision to
;
replace a historic bridge including the determination of the feasibility for reuse, discusses the cases in which
;
metal truss bridges are commonly stored in situ versus being removed and stored at an off-site location, then
;
addresses the early tasks to be undertaken once the decision has been made to store a bridge. These activities are
;
referred to broadly as the evaluation and stabilization of the bridge. This is followed by an assessment of best
;
practices in the areas preservation, documentation, marketing, disassembly, transportation, and cost estimation as
;
these pertain to storage. The research concludes with a case study that analyses the marketing and storage of a
;
historic metal truss bridge in Griffin, Georgia, which was replaced in 2012.
White, D. W., Teizer, J., Fang, Y., Nguyen, T. V., & Jarriell, R. (2014). Best management practices for storage of historic metal truss bridges (Report No. GA-14-1205). Georgia. Department of Transportation. Office of Research. https://rosap.ntl.bts.gov/view/dot/28650
White, Donald W., Jochen Teizer, Yihai Fang, Thanh V. Nguyen, and Ryan Jarriell. Best management practices for storage of historic metal truss bridges. Report no. GA-14-1205. Georgia. Department of Transportation. Office of Research, 2014. https://rosap.ntl.bts.gov/view/dot/28650.
White, Donald W., et al. Best management practices for storage of historic metal truss bridges. Georgia. Department of Transportation. Office of Research, 2014, Report no. GA-14-1205, ROSA P. https://rosap.ntl.bts.gov/view/dot/28650.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.