Load distribution and fatigue cost estimates of heavy truck loads on Louisiana state bridges.
-
2013-11-01
-
By Saber, Aziz
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The bridge in this study was evaluated and a monitoring system was installed to investigate the effects of heavy loads and ; the cost of fatigue for bridges on state highways in Louisiana. Also, this study is used to respond to Louisiana Senate ; Concurrent Resolution 35 (SCR-35). The superstructure of the bridge in this study was evaluated for safety and reliability ; under four different kinds of truck configuration and loads hauling sugarcane. The bridge model was verified by performing ; live load tests using 3S3 trucks with a gross vehicular weight (GVW) of 100,000 lb. on the structure. The bridge finite ; element model was analyzed under the different kinds of loading and the effects were listed and compared. The results of ; the analyses show that the pattern of response of the bridge under the different cases follows the same trend. Among the ; four different cases of loading configurations, case 4, which was GVW =148,000 lb. and a vehicle length of 92 ft., produced ; the largest tensile and compressive stresses in the members. The results from the bridge deck analyses confirm that the ; bridge deck is under a stable stress state, whether the stresses are in the tension zone or the compression zone. The heavy ; load as indicated in SCR-35 will cause damage to bridges. ; The data from the monitoring system indicates that the average number of heavy loads during October, November, and ; December is 3.5 times higher than the rest of the year. The bridges are exposed to high cycles of repetition of heavy loads ; that will reduce the life span of the bridges by about 50%. The bridges that are built to last 75 years will be replaced after ; about 40 years in service. This seasonal impact is due to the sugarcane harvest and confirms the cost of fatigue, $0.9 per ; truck per trip per bridge, as determined in the previous study. ; Based on the results of the studies presented in this report, increasing the gross vehicle weight of sugarcane trucks is not ; recommended. The heavy loads indicated in SCR-35 will cause premature fatigue damage to the main structural members ; and could cause their eventual structural failure. In addition, the majority of the Louisiana bridges currently in service were ; designed to accommodate lower loads than the bridge tested on this project. Therefore, based on the test results, one should ; expect that the proposed trucks to significantly shorten the remaining life span of Louisiana bridges. All these bridges ; should be rehabilitated prior to implementing SCR 35. The data from the monitoring system will provide a good source of ; information to review the current serviceability criteria used by the Louisiana Department of Transportation and ; Development (LADOTD) for the design of prestressed concrete bridge girders.
-
Format:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha256:72207dab2eac8ef75d4263bd0a487406b3e7f12cde7d265454d7de6513be8891