Impact of nighttime paving operations on asphalt roughness behavior.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Impact of nighttime paving operations on asphalt roughness behavior.

Filetype[PDF-1.68 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance;NTL-HIGHWAY/ROAD TRANSPORTATION-Pavement Management and Performance;
    • Abstract:
      The relationship between nighttime construction scheduling and future road quality in terms of roughness was investigated. Research was three-phased: interviews with local leaders in paving, on-site observations, and historical data analyses. Interviews and on-site observations served to explore potential differences in the paving practices and general opinions in the paving industry regarding daytime versus nighttime paving, while the bulk of empirical research took place in the historical data analyses. Differences in road quality, defined as pavement roughness in this study, between day-scheduled construction and night-scheduled construction were determined by an analysis of the International Roughness Index over the pavement lifecycle as made available to researchers by the Alabama Department of Transportation. Results showed that the roughness values of pavements laid at night were significantly higher than those of pavements laid in the day. Analyzed in 3, 30-month intervals beginning at project completion, night and day roughness values were equal in the first interval, but differences in means and variances expanded in the second and third intervals, with increasing significance over time. Researchers believe the increasing gap over time could be the result of initial night-time construction conditions lack of inspector involvement, low illumination levels and poor visibility, and worker fatigue, with inspection problems being most detrimental.

      Several previous reports investigated the initial construction quality of pavements constructed during the day vs. pavements constructed at night. This report follows the difference in roughness of such pavements over time. The research and results are further discussed in this report.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26