Comparative Life Cycle Assessment between Warm SMA and Conventional SMA
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Comparative Life Cycle Assessment between Warm SMA and Conventional SMA

Filetype[PDF-1.39 MB]


  • English

  • Details:

    • Alternative Title:
      CIVIL ENGINEERING STUDIES : Illinois Center for Transportation Series No. 11-090
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      This report presents the comparative life cycle assessment (LCA) between warm stone mastic asphalt (SMA) and conventional

      SMA. Specifically, the study evaluated and compared the life cycle environmental and economic performances of two mixtures: a warm

      SMA binder course mixture with a chemical additive and a control hot SMA binder course mixture. Both of these mixtures were utilized

      as part of a complete overlay project on the Veterans Memorial Expressway (I-355) near Chicago as part of the Illinois Tollway system.

      The results of this study indicate that the warm SMA provides significant environmental benefits compared to the control hot SMA.

      When the mixing temperature was decreased from 325 to 280 oF (168 to 138 oC), the overall environmental impact of the material,

      production, transportation, and placement was reduced by 6.4% due to the use of warm mix additive. More environmental benefits can

      be expected if the mixing temperature is further lowered. It was also concluded that using warm mix additive slightly increases the initial

      construction cost of SMA pavement. However, the warm SMA overlay allows for traffic to be opened earlier, so the user cost caused by

      traffic delay is reduced, and the total economic cost of the warm SMA is lower than that of the control SMA. In addition, the warm SMA

      allows for the use of a higher percentage of RAP because of less binder aging. With a 10% increase in RAP usage, the initial

      construction cost of the warm SMA becomes 3.5% lower than that of the control SMA. The overall performances of the control SMA and

      the warm SMA were compared by calculating a weighted environmental and economic score and the total cost (environmental, agency,

      and user costs). Both the weighted score and total cost data show that the warm SMA provides better overall performance compared to

      the control SMA. Therefore, besides being more environmentally friendly, the warm SMA is also economically competitive compared to

      the control SMA.

      This study didn’t include the cost benefits of the warm SMA due to an extended paving season and longer hauling distance because

      these benefits are difficult to quantify. In addition, the warm SMA may reduce the risk of poor compaction during construction, which

      ensures long-term pavement performance, and therefore saves costs related to maintenance and rehabilitation.