Abstract:This report summarizes the findings of research directed at identifying maintenance solutions for bleeding and ; flushed asphalt pavements surfaced with seal coats or surface treatments. Although the basic mechanism associated with ; both bleeding and flushing has to do with excess asphalt binder filling the voids between aggregate particles, the terms are ; different ― “flushed” is past tense; whereas, “bleeding” is an active verb. Factors that contribute to bleeding and flushed ; pavements include aggregate issues, binder issues, traffic issues, environmental issues, and construction issues. There is no ; better advice for dealing with bleeding and flushed pavements than to avoid the problem from the outset. Bleeding is an ; immediate maintenance problem that must be addressed using corrective or in some cases, emergency, maintenance. The ; basic approaches used to treat bleeding either (a) bridge over the liquid asphalt by applying aggregate of various types and ; gradations, (b) cool off the pavement surface by applying water with or without additives, or (c) remove the bleeding ; asphalt and rebuild the pavement seal. Flushed asphalt pavement, in contrast to bleeding, is typically not a maintenance ; problem that must be addressed immediately. The basic approaches used to treat flushed pavements either (a) retexture the ; existing flushed pavement surface or (b) add a new textured surface over the flushed pavement. Our research suggests that ; the use of polymer modified and other binders has improved seal coat and surface treatment performance such that bleeding ; and flushing problems are becoming less common. Three promising areas for further research and implementation relative ; to bleeding/flushing solutions include (a) use of lime water, (b) ultra high pressure water cutting, and (c) use of the rackedin ; seal at intersections.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha256:33f746f9f52c1ad8ec2db1b8c9ec7656f1f78124c2bc4f4fcb7a0fb53fdcb377