Accelerated bridge construction (ABC) decision making and economic modeling tool.
-
2011-12-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:United States. Federal Highway Administration ; California. Department of Transportation ; Iowa. Dept. of Transportation ; Minnesota. Dept. of Transportation ; Montana. Dept. of Transportation ; Texas. Dept. of Transportation ; Utah. Dept. of Transportation ; Washington (State). Department of Transportation
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final report.
-
Corporate Publisher:
-
Abstract:In this FHWA-sponsored pool funded study, a set of decision making tools, based on the Analytic Hierarchy Process (AHP) was developed. This tool set is prepared for transportation specialists and decision-makers to determine if ABC is more effective than traditional construction for a given bridge replacement or rehabilitation project. The tool set is user-friendly, flexible to accommodate a range of construction situations, transparent as to the method of calculation, and customizable to maintain future relevance. To accommodate this task, a comprehensive literature review on a number of relevant domains such as ABC construction techniques and decision making approaches, were completed. The findings were summarized into a decision model hierarchy that was also incorporated into the decision making software. The software was tested through evaluating a set of real-world construction projects.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:9ead63f43f6226fa1be2c93ef3fb833e3b8e0f6fb53d0149ab785ceb83b37fdd75d45ec3a71fa286a24aa450b6162d763a7293bb054b8c51d3f4124bf9cb7e51
-
Download URL:
-
File Type: